1/31/11 MONDAY DESK CRITIQUE:
Block/Stack Plans (minimum of 3)
Things to prepare for next week:
Fix Program
- Add more detailed square footages for cafe, and apartments
- Linear footage on countertops and equipment
Add to block plans
- Specify particular spaces ex: where is the check-out counter within the check-out space
- Decide about elevator access on second floor tenant spaces
- What to put on the 4th floor, if elevator access is removed
2/2/11 WEDNESDAY GROUP MEETING:
Hey Guys!
We didn't get to meet this week as a group but still need to turn in our weekly journals to Elizabeth! I just figured this would be the best way to talk about our project to each other since Alyssa is headed to Austin and we're all stuck in this stupid snow!
So, pretty much what I have done this week and finished detailing my program (except the restaurant area) and begun creating different layouts of different areas within the building. I have started to lay out each type of room in the hotel (king, queen, and suites) and have come up with 3-5 of each to see which f.p. works the best. I would show you guys but its all on CAD. As soon as I'm done with the hotel rooms, I'm going to begin working on the 2nd mezzanine area and create different f.p. options for that area as well!
What have you guys been working on? Can't wait to see you guys in person so we can look over everyone's stuff!
Bethy
Alyssa Smith:
great idea!
I have been working with WiIlie on finalizing our floor plan and structural plan. Next we will be laying out the furniture plan and specifying designated areas of the restaurant and lounge areas. We are also adjusting the egresses and vertical circulation.
No comments:
Post a Comment